Before the SmartJack® System came into play, this home in Innisfil, ON, showed the effects of tired support beams. The floors had started to sag, making it clear the structure needed a lift.
As you can see in the photos, we carefully installed SmartJacks to bring those floor joists back to their proper position, giving them the support they were missing. With stability restored, the beams are now doing their job like pros, keeping everything solid above.
The floor is no longer slouching; it’s back in action and holding strong.